Factory Direct Fedar Sublimation Printer in Guangzhou International Exhibition
Fedar sublimation printer factory participates in the international exhibition every year, it will bring a strong shock to the exhibition site. We have always adhered to the high requirements of “Quality leads the standard and professionalism creates the brand” to create a good reputation in the digital printer industry.
LOGISTICS ABILITY:
MT Industry Arranges the Mixed Logistical for delivery as By Sea, By Air and By Truck or Train, Over 10 Years’ Experience for Logistical Arrange.
MANUFACTORY SCALE:
The Total Manufactory Area: 30,000 square meters (322,916 square feet)
Production Staff: 500 QC Staff: 25 R&D: 25
DELIVERY TIME:
1) Material Preparation Time: Instock Any Time
2) Spare Parts Preparation Time: Instock Any Time
3) Metal Processing Time: 5 days
4) Assembly & Testing & Packaging Time: 2 days
5) Total Delivery Time: 7 days for 1 set for safe delivery lead time
The Faster Delivery Could be Negotiable Sometimes!
USAGE/OCCASION
Heat Transfer Printing, Tshirts Transfer Printing, Garments Transfer Printing, Hat Transfer Printing,